Friday 12 August 2011

Kleiner Park fabrication update

Starting to add in the details; these curving pipes are probably the most important element of the design; both aesthetically & symbolically...   I'm very excited to see it coming together!
The pipes will flow & twist up each sculpture & around the wind turbine at the top....
When its all done, it will look like a continuous curving line from the base to the top...
kinda like this...but not quite, lol; there have been a few design changes along the way :)
The other 2 structures are almost done; as soon as they are, they will be moved inside to start working on the curving pipes; each will have a similar feel, but will be different.

More pics later today :)

Amber

No comments:

Post a Comment