The design is pretty much finalized: now Kevin has to draw all the files for the pieces to by cut on the waterjet: this will take a lot of time & planning to make sure everything will go together correctly, that we are making the best use of materials, etc. Hoping to have pieces cut in March & start on the fabrication. This project is a bit different---so much of the work is being done in the planning & design phase: when it comes to fab, we will be putting lots of pieces together, but everything will be already layed out like a puzzle. There will be very little welding; most of the pieces will be joined with bolts/rivets: we have to bring everything into the building through the front doors; just regular sized man doors, so the whole project is designed in pieces that will be put together on site.
Still lots to do; more updates to come!!
Amber